Plan vs actual
1 step leftPlanned
17m
Actual
21m
Drift
+4m
| Step | Duration | Planned | Actual | Drift |
|---|---|---|---|---|
| Read the billing contract notes | 2m | 3m | +1m | |
| Map the entitlement resolver | 3m | 2m | −1m | |
| Patch the tier lookup fallback | 6m | 11m | +5m | |
| Add a renewal-grace test | 5m | 5m | , | |
| Summarize the handoff | 1m | - | - |